A Level Accounting (9706)•9706/11/O/N/22

Explanation
Calculating total production cost using absorption costing Steps:
- Determine raw materials cost for 3000 pairs: Information on raw materials cost per 50 pairs is incomplete (no dollar amount specified).
- Calculate direct labour hours: Ambiguous, as "labour 475" could mean 8/hour.
- Compute direct labour cost: Requires clear hours, then multiply by $8/hour.
- Add absorbed overhead: Multiply labour hours by $6.25/hour, then scale all to 3000 pairs (60 batches of 50).
Not enough information.
Final answer: Not enough information.
Topic: Traditional costing methods