mMCQ.

Navigation Menu

Step into mMCQ.

Launch mMCQ. diagnostic

Explore mMCQ.

MDCAT prepFree DiagnosticPricing & SubscribeSign in

Resources

Terms & Conditions

mMCQ.

© 2021 - 2025 mMCQ.All rights reserved.

WhatsApp
A Level Accounting (9706)•9706/13/O/N/19
Question 25 from 9706/13/O/N/19

Explanation

Under/Overhead Absorption via Capacity Variance Steps:

  • Calculate absorption rate: actual overheads ÷ budgeted machine hours = 296,000÷50,000=296,000 ÷ 50,000 = 296,000÷50,000=5.92 per machine hour.
  • Identify unused capacity: budgeted machine hours - actual machine hours = 50,000 - 46,000 = 4,000 hours.
  • Compute under absorption: unused hours × absorption rate = 4,000 × 5.92=5.92 = 5.92=23,680 (approximately $23,000).
  • This measures overheads not recovered due to lower activity using actual overheads spread over budgeted capacity.

Why A is correct:

  • It matches the capacity (volume) variance formula for under absorption: (budgeted activity - actual activity) × (actual overhead rate based on budgeted activity), indicating $23,000 unrecovered overheads.

Why the others are wrong:

  • B: Ignores activity shortfall; actual overheads lower but not by only $2,000 over recovery.
  • C: Confuses total overhead difference (350,000−350,000 - 350,000−296,000 ≈ $54,000) with absorption variance.
  • D: Minor miscalculation; no basis for small $1,000 over absorption.

Final answer: A

Topic: Traditional costing methods

Practice more A Level Accounting (9706) questions on mMCQ.me