A Level Accounting (9706)•9706/11/M/J/22

Explanation
Missing production data prevents wage calculation Steps:
- Basic wages = 35 hours × 840.
- Standard time per unit = 15 minutes = 0.25 hours; target standard time = 170 units × 0.25 hours = 42.5 hours.
- Time saved requires actual units produced (standard time for actual units - 35 hours), but actual units (good + 2 rejected) unknown.
- Bonus = 25% × 50 = $100. Not enough information.
Final answer: Not enough information.
Topic: Standard costing