Identify costs directly attributable to the new workshop extension Steps:
- Include building cost of $65,000 as it is for constructing the new extension.
- Include legal fees of $6,000 as they relate to acquiring or setting up the new extension.
- Exclude air conditioning system of $2,800 since it is specified for the original workshop.
- Exclude decorating costs of 800 as they are repairs or maintenance, not capital costs for the extension.
- Add qualifying costs: 6,000 = $71,000.
Why C is correct:
- Under accounting principles, the cost of a new asset includes purchase price (building) and directly attributable costs like legal fees, totaling $71,000 for the extension.
Why the others are wrong:
- A includes irrelevant original workshop costs like air conditioning, understating extension-specific expenditure.
- B incorrectly adds partial original workshop items, mixing extension and non-extension costs.
- D overincludes decorating for the new extension, which is not capitalizable as part of the asset cost.
Final answer: C
Topic: Capital and revenue expenditure and receipts